Case StudyOur Projects

At AJMS, we’re proud of having built our reputation as one of the leading civil engineering firms nationwide.
Pokesdown structure 2
Pokesdown Existing
Pokesdown existing

The project was to renew the life expired TRU, HV Switchgear and DC switchgear from the old substation at POkesdown, with the option to include NSCDs/integrated breakers as part of the new arrangement. The requirements included the completeion of surveys option selection, Approval In Principle and detailed design for the new substation.

nscd-new-5
nscd-new-4
nscd-new-2

As part of multiple schemes for the Negative Short Circuiting Devices, including Safer Isolations Phases 3, 4 & 5, over 100 sites have been surveyed and designed for including B4 and B5 sites and a variety of equipment. The sites are located across Kent and Sussex areas including Central London.

CTS-4
CTS-3
cts-2

As part of Network Rails Safer Isolations in and around Wessex, several alterations to track feeds were required to be undertaken to allow for safer isolations.  A number of the equipment locations required civil design and input at AIP and detailed designs stages.

SMD CP6 FRAMEWORK HV FEEDER RENEWALS
CP6-3
CP6-4

As part of the CP-6 Frameworks a number of the HV Feeders across the Kent and Sussex regions have been earmarked for renewal to ensure greater reliability across the network.

feature image 1 kings cross project copy
kings-cross-1
kings-cross-2

As part of the £1.2 billion East Coast Upgrade, the King’s Cross Remodelling Scheme will require infrastructure around King’s Cross Station to be replaced or redesigned, including tracks, signalling, platform and overhead line equipment. 

signal screening
signal-screening-2
signal-screening-3

As part of the £1.5bn MML improvement programme, a section the line between north of Bedford to Kettering and Corby was electrified in November 2019. A numbers of existing signals along the route are however still classified as not “Electrification ready” and require further assessment or remedial works to be performed.

oxted 2
OX-5
OX-4

Due to a winding fault at Oxted Substation, the existing 11kV rectifier transformer requires renewal. As well as this, the existing rectifier needs to be replaced to release critical strategic spares. Both the rectifier and the rectifier transformer have been out of service since August 2017.

https://ajmsconsultants.co.uk/wp-content/uploads/2024/10/Untitled-500-x-300-px-e1729157814562.png
https://ajmsconsultants.co.uk/wp-content/uploads/2023/07/Constructioninline-SBS-blue-background-1536x468.jpg

©2026 AJMS Consultant. All rights reserved | Terms and Conditions | Privacy Policy