The project was to renew the life expired TRU, HV Switchgear and DC switchgear from the old substation at POkesdown, with the option to include NSCDs/integrated breakers as part of the new arrangement. The requirements included the completeion of surveys option selection, Approval In Principle and detailed design for the new substation.